🇮🇳 Tirupur, India

Real Orders

Client Order Case Studies — How Fabric Crew Delivers

Real bulk apparel orders handled end-to-end — premium polo shirts to the Netherlands, reversible rugby jerseys to UAE, and a full sports kit consolidated into one shipment. See the detail behind how we work.

✓ Real Orders✓ Export Documentation✓ Pre-Production Samples✓ On-Time Delivery
Start Your Order
Case Study 01
Netherlands — Embroidered Corporate Polo Shirts

Premium Embroidered Polo Shirts — Netherlands, 500 Pieces

Product
220 GSM Piqué Cotton Polo
Quantity
500 pcs, mixed S–2XL
Destination
Netherlands (EU)
Lead Time
3 weeks + 6 days air freight

Specification

  • Fabric: 220 GSM piqué cotton, Pantone 286C navy — custom colour matched via lab dip process (3 lab dips submitted before client approval)
  • Decoration: Full embroidery — left chest logo 8,000 stitches, full back logo 14,000 stitches, right arm text 3,500 stitches. Total 25,500 stitches per garment. Madeira thread, Pantone-matched colours.
  • Finishing: Bio wash + silicon wash (premium tier), compacted fabric, garment wash, OEKO-TEX certified base fabric
  • Documentation: EU HS 6105, 12% import duty, Certificate of Origin provided for Netherlands customs clearance

The Challenge

The client required an exact Pantone 286C navy — a mid-dark blue that reads differently depending on dye bath temperature, fabric composition, and finishing treatment. Our first two lab dips came back slightly purple-toned and then slightly green-toned under office lighting. The third submission was approved. The back embroidery (14,000 stitches at full back width) required additional backing stabiliser to prevent distortion on the 220 GSM piqué — a standard piqué backing weight is insufficient for a logo this size. We specified a heavier cut-away backing and submitted a stitch-out sample on actual 220 GSM production fabric before the client signed off on bulk.

Outcome

Client approved pre-production sample (1 piece per size, full embroidery, finished fabric). Bulk of 500 pieces produced, quality inspected, and dispatched. Air freight Amsterdam: 6 days. Client reordered 300 pieces four months later without requesting additional samples.

Case Study 02
UAE — Reversible Rugby Jerseys

Reversible Sublimation Rugby Jerseys — UAE Rugby Club, 250 Pieces

Product
Reversible Sublimation Rugby Jersey
Quantity
250 pcs (adult + youth sets)
Destination
UAE (0% CEPA duty)
Lead Time
2 weeks + 4 days air freight

Specification

  • Fabric: 160 GSM moisture-wicking polyester, two colourways per garment (reversible construction: flip inside out for home/away)
  • Decoration: Full sublimation both sides — club crest, player numbers, sponsor logo. Unlimited colour coverage, no seam bleeding.
  • Sizes: Adult set (S–2XL) and youth set (YXS–YXL) in one combined order
  • Duty: India-UAE CEPA — 0% import duty on HS 6112. Full CEPA documentation provided.

The Challenge

Reversible sublimation construction requires exact colour calibration on both sides of the garment simultaneously. Any colour bleed at seams shows on the opposite side when the jersey is reversed. We ran a 5-piece pre-production sample set covering two adult sizes and one youth size, with both sides fully sublimated, before bulk approval. The client reviewed the samples in Dubai, confirmed colour accuracy and seam quality, and approved bulk in writing. Youth sizing was also validated on physical samples — UAE youth sizing requirements differ from Indian standard sizing.

Outcome

Delivered on time for the start of the rugby season. Air freight Dubai: 4 days from dispatch. Club ordered matching training polo shirts 6 weeks after delivery — reorder placed without additional sampling.

Case Study 03
UAE — Full Sports Kit, 3 Product Categories

Full Sports Kit — UAE Play Area Club, 500 Pieces

Products
T-shirts + Socks + Jackets
Quantity
500 pcs per category
Destination
UAE (0% CEPA duty)
Lead Time
3.5 weeks + 5 days air freight

Specification

  • T-shirts: 500 pcs, 160 GSM dry-fit polyester, sublimation logo front and back, club branding
  • Anti-slip socks: 500 pairs, cotton/nylon blend, custom anti-slip silicone grip dots on sole (client-specified pattern), branded woven label
  • Zip-up jackets: 500 pcs, 280 GSM fleece, embroidered club logo, contrast zip and cuffs, branded inner label
  • Duty: All three product categories cleared at 0% under India-UAE CEPA. Full duty documentation provided for each HS code.

The Challenge

Three product categories in one shipment meant three different fabric suppliers and three different production units running simultaneously. Coordinating parallel production tracks to meet a single ship date — while maintaining individual quality standards for each category — is exactly the kind of multi-product order that a single factory cannot handle. We assigned a dedicated production track to each category, ran concurrent timelines, and consolidated all three into one air freight shipment. The anti-slip socks required a custom silicone dot mould to match the client's specified grip pattern — the mould was produced and approved on sample socks before full production.

Outcome

Full kit delivered in one consolidated shipment — single commercial invoice, single air waybill, single customs entry. The client saved on freight vs three separate orders and received the full kit in time for their season launch. Club staff uniforms (polo shirts + jackets) followed 8 weeks later.

Why Case Studies Like These Are Possible

Each of these orders involved complexity that a single factory cannot address: exact Pantone lab dip iterations, reversible sublimation calibration, multi-category parallel production, custom silicone mould fabrication. Fabric Crew is a sourcing coordinator, not a single factory — which means we route each product category to the specialist unit best suited for it, coordinate the timelines centrally, and deliver one consolidated shipment with complete documentation.

This is the model explained on our About page — and these three orders are what it looks like in practice.

Start Your Order → Custom Polo Shirts Sports Jerseys Workwear

Ready to Place Your Order?

Tell us your product, quantity, and destination market. We'll respond within 24 hours with a quote and a clear production plan.

Get Your Free Quote Now